Verizon and T-Mobile have asked the FCC for permission to run experimental tests in the 4.8 to 4.9 GHz band. The filings are early signals about 6G. They are already raising questions for landlords who host wireless equipment.
The short version is simple. These are test requests, not network rollouts. The tests are small and tied to company campuses. Nothing in them changes a tower lease today.
Still, 4 GHz 6G testing is worth understanding. It shows where carriers expect to put spectrum and equipment dollars in the years ahead. Tower landlords who read it correctly avoid two mistakes. They do not ignore it, and they do not overreact to it.
Horizon Tower Group LLC helps property owners review cell tower leases, equipment rights, and buyout offers. This article covers what was filed, when it was filed, and what it means for you. It also covers what it does not mean.
Our main source for the filings is Fierce Network’s report from September 23, 2026. We checked the policy dates against the NTIA announcement of July 31, 2026, and the Verizon details against its filing text.
What Did Verizon and T-Mobile Actually File?
Both carriers applied for FCC experimental authorizations to test in the 4.8 to 4.9 GHz range. These are requests. The reporting does not say either one has been granted.
Verizon wants a one-year grant for tests in and around its Los Angeles lab. The tests use Ericsson hardware and software on a private network not connected to commercial operators. Verizon calls the work a precursor to 6G sensing and communication. It limits the request to a small area around its lab.
T-Mobile wants a two-year grant for tests at six sites in and around its Bellevue, Washington headquarters. The plan covers up to six temporary fixed base stations. Three would sit at headquarters and three at its lab campus. Each would serve up to six experimental mobile devices.
Timeline of the 4 GHz FCC Filings
Verizon’s September 4 filing appears to be the first major carrier request since NTIA cleared its final 4.4 GHz study plan on July 31. T-Mobile followed on September 17.
- July 31, 2026: NTIA announces the Administration cleared a plan to study the 4.4 GHz band for full-power commercial licensed use. NTIA says approval starts a 60-day review by the Commerce and Appropriations Committees before funding can be released.
- September 4, 2026: Verizon files for a one-year experimental grant.
- September 16, 2026: CTIA releases a report arguing the band should be set aside for exclusive licensed use. A group backing spectrum sharing releases an opposing report the same week.
- September 17, 2026: T-Mobile files two applications for a two-year grant. It also seeks separate tests at 2.7 GHz.
- September 23, 2026: Fierce Network reports on the filings.
An engineering consultant told Fierce his search was not exhaustive. He did not find a recent 4 GHz application from AT&T, but other filings may exist.
What 4 GHz 6G Testing Means for Tower Landlords
These filings show carriers are preparing for the next round of spectrum. They do not show new equipment coming to your site.
Here is what the filings do signal:
- Carriers are investing in 6G planning before the band is licensed.
- Federal policy is moving. NTIA has approved study plans for four bands.
- Spectrum decisions could shape network buildouts for years.
The tests use temporary base stations at carrier lab and headquarters sites, not leased towers. Verizon’s filing says that if a deployment develops from its trial, it would use its own licensed spectrum. If the band is later licensed and deployed, carriers may ask to change equipment at existing sites. That is when your lease terms matter.
What These Filings Do Not Mean
The filings do not mean 6G is deploying, that the band is cleared, or that your lease is about to change.
- No license exists. An experimental authorization is not a commercial license.
- No commercial service is planned in these filings. Verizon’s test network is private.
- The band is not free. Federal agencies still use it for defense, homeland security, and public safety systems.
- No near-term timeline exists. Broadband Breakfast reports that FCC Chairman Brendan Carr said an auction in the band would be years away.
- No rent change follows. Nothing in the filings affects lease payments.
No filing, by itself, is a reason to sell your lease. It is also not a reason to refuse an offer.
What Should Tower Landlords Do Now?
Read your lease before you react to the headlines. Most of the value sits in a few clauses.
- Find the equipment modification clause. Note what the carrier may add or swap without your consent.
- Check amendment terms. Look for fees, rent increases, or approval rights tied to new equipment.
- Review the term, renewal, and termination language.
- Keep a current record of the equipment on your site.
- Get an independent review before you sign any amendment or buyout.
If you are weighing an offer, see how we handle a cell tower lease buyout before you respond.
Frequently Asked Questions
Is 4 GHz the same as 6G?
No. 4 GHz is a spectrum band. 6G is a future wireless generation. The band runs from 4.4 to 4.94 GHz. Carriers are asking to test in the 4.8 to 4.9 GHz portion.
Will 4 GHz 6G testing change my cell tower lease rent?
Not based on these filings. The tests are experimental and run at carrier-controlled sites. Your rent depends on your lease terms, not on spectrum tests.
Has the FCC approved these tests?
The reporting describes applications, not grants. You can look up current status in the FCC’s Experimental Licensing System.
Who uses the 4 GHz band today?
Federal agencies use it for defense, homeland security, and public safety systems. NTIA has cleared plans to study the 4.4 GHz band for possible commercial use and says it will post progress on spectrum.gov.
Conclusion
4 GHz 6G testing is an early signal, not a change to your tower lease. Verizon and T-Mobile have filed requests, and the policy path is still open. Know your lease terms before any amendment arrives. If you want a second opinion, Horizon Tower Group LLC offers a free lease review with no obligation.
